HYDE ENGINEERING
Western Company of North America
Home
Consultant Profiles
Our Background
Services
Contact Us
Projects

Western Company of North America

1980 to 1986  and  1988 to 1990

                  Fort Worth, Texas

Position:

                  Project Engineer: Special Projects group

                  Field Engineer: Field Engineering group

                  Senior Project Engineer: Downhole Tool group

                  Field Engineering Manager: Field Engineering group

                  Project Engineering Manager: Downhole Tool group

                  Activity:

·         Associate in design of the 20K Pressure-master hydraulic powered intensifier system using four each 2000 HP 16V149 TI power units for one hydraulic intensifier working with Thorne Industries

·         Evaluate the design of a 7000 SHP single gas turbine unit (Allison 570K) to replace the four diesel power units in the 20K Pressure-master system working with Penske Power Systems

·         Evaluate bulk material handling system(s) for gelling frac fluid on-the-fly

·         Evaluate wet chemical delivery system problems and operate equipment during treatment (TIC injection system).

·         Associate in design of blender tub level control system as a means of improved density control. Install mechanical components on blenders in East Texas.

·         Field introduction of automated frac blender (Hydropace) operating at 4000 GPM with proppant rate of 30,000 PPM with two wet and two dry chemical add systems while maintaining slurry density within 2%. Mechanical system included four main hydrostatic drives and two accessory system drives.

·         Evaluate design of high-rate sand delivery system (Cambelt) capable of 10,000 PPM sand from either or both belts.

·         Design and test high pressure (15,000 PSI) centrifuge-type sand concentrator for use with Nitrogen foam fracturing treatment. System complete with means of de-energizing fluid at high pressure. Patent granted #4,588,509

·         Associate in design of foam generator; used to develop optimum bubble size for maxmimum proppant transport in foam frac operations

·         Teach foam fracturing short course (how to use sand concentrator with latest instrumentation in foam fracturing operations)

·         Construct and operate device to commingle Nitrogen gas with multiple fluids below the wellhead (Union Oil)

·         Design and build manifold trailer with 15,000 PSI treating iron. Allowing 12 pump trucks to be inter-connected for a single stimulation job. Revenue was greatly imcreased due to the greater number of stimulation treatments performed per unit time.

·         Evaluate refurbished air liquification plants for in-house production of cryogenic Nitrogen (liquid Nitrogen) at Gibson Cryogenics and Alabama Oxygen

·         Specify, evaluate and approve design of Liquid Nitrogen transport units for oilfield service; working with LOX Equipment. Both 7000 and 5200 gallon trailers, and 3000 gallon body-load units. Built to WPS standards with higher delivery capacity than industry standard.

·         Specify, evaluate, and approve design of a 39,000 gallon high-rate liquid Nitrogen delivery system for installation in Bryan, Texas; working with Linde Cryogenics. Simultaneous delivery of 150 GPM from any or all three delivery stations with backup provision. Negotiate cost and justify expenditure to region operations.

·         Provide engineering design and field support to WPS introduction of Nitrogen pumping equipment in the Rockies (Farmington, NM); Airco and Cryomec equipment delivering GN2 at 15,000 PSI and rates to 1MMSCFM

·         Evaluate equipment  and assist in writing safe operating procedures for pumping CO2. Conduct CO2 training school in Mineral Wells.

·         Equipment modifications to CO2 booster system evaluated (Kilgore)

·         Associate in design of flowback manifold for highly abrasive (bauxite slurry) flowback system; flow back well for Perry R. Bass at 9000 PSI.

·         Design, field test, and implement equipment changes to best use WPS design recirculating cement mixer with WPS low pressure bulk delivery system for use both onshore and offshore.

·         Develop the WPS Cyclone mixer (patented), a revolutionary recirculating mixer compatible with WPS bulk delivery system. Field tested with over 40,000 sacks of various cment blends.

·         Design modification and field introduction of automated cement pump truck. Radical departure from existing technology in every aspect of design. Field introduction to East Texas, South Texas, Rockies. 

·         Evaluate bulk cement delivery system for high-rate mixing. Make recommendation to increase delivery pressure.

·         Teach recirculating cement mixing technology course to WPS and customer personnel. Course consists of classroom and actual equipment operation (mixing cement).

·         Joint project with D.O.E. using cement equipment for waste disposal

·         Perform ultra-sonic thickness inpection of treating iron (wall thickness)

·         Study to re-work v. replace worn field iron. Develop engineering standards.

·         Project to remove and re-use iron from idel equipment. Complete inspection by third party (Tuboscope)

·         Implement rapid warm-up system on equipment operating in cold climate. Circulates road engine cooling water through deck engine to warm while roading to location.

·         Design and evaluation of high-rate frac heads; internal material treatment to maximize erosion resistance (Ion nitride, Boron nitride)

·         Design hydrostatic transmission to replace DDA deck engine on Cryomec high-rate Nitrogen pump

·         Field test and training on the use of standard and high-rate wellhead isolation tools (treesavers).

·         Evaluate different flowmeter designs (non-invasive type) in different gelled fluids

·         Perform field replacement and calibration of Texas Nuclear radioactive cement densiometers on all onshore and offshore installations.

·         Represent engineering at various cement and hydraulic fracturing treatments including massive hydraulic fracture treatments in Kilgore and Laredo

·         Integrate line of float equipment into WPS product line (engineering and manufacture)

·         Design and field introduction of one-trip gravel pack system. Write all technical and marketing literature.

·         Associate in design of numerous service and production tools

·         Design and field use of “blowout” packer. Tool is snubbed into a well while the well is blowing out, and is set using either well pressure or tubing pressure. Used successfully on a well flowing 30MM gas and 3000 BPD distillate.

·         Associate in design of pressure “regulator” for use in high pressure fracturing (Sun Oil).

·         Technical response to bid tenders through WPSI

·         Represent WPS downhole tool at various trade shows (SPE, LAGCOE, etc.)

·         Design, build, and operate downhole tool test facility for WPS

·         Design enhancements to Wellhead isolation tools (tubing and casing sizes) to permit operation at high slurry rate

·         Write engineering bulletins on new products, product modifications, and operational changes.

·         Write computer software to predict erosion of customer tubing during high-rate treatment using wellhead isolation tools.

·         Sales and training seminars for Exxon, Chevron, Tenneco, Shell, Amoco and Mobil as well as independent oil and gas producers

·         Taught Advanced Tool Traning session on Sand Control Methods at WPS technical training center.

·         Perform accident investigation on behalf of WPS (five major investigations)

·         Represent WPS as registered professional engineer in legal matters.

 

 

Additional Training at WPS:

·         Basic Well Operations (OGCI)

·         DOT card and Commercial driver’s license

·         Down Hole Pump Training (WPS)

·         Basic Stimulation Techniques and Design (WPS)

·         Stimulation Technical Development (WPS)

·         Cementing Technical Development (WPS)

·         Lubrication Seminar (UTA)

·         Failure Analysis School (Outside consultant)

·         Supervisory Skills & Techniques (WPS)

·         Supervisory Core Phase II (WPS)

·         Engineer as Manager (Batelle)

·         Finite Element Analysis (Algor Interactive Systems)

 

 

 

 

General Offices - Fort Worth, Texas